| As an important link in the examination and approval of construction projects,the quality and efficiency of drawing examination are related to the quality safety and progress of the whole construction project.But for a long time of the traditional"blueprint" mode of series examination mode has already can not meet the requirement of the modernization of the progress and quality,according to the mode of the original graph,combining parallel digital plan approval and drawing review,explore the use of digital photos united review system to realize the joint review,information sharing,digital delivery,the entire regulation "explore digital photos of trial mode,and the optimization al review process,improve the work mechanism,the innovation service measures,constantly optimized digital photos and the service efficiency of the system.First of all,through a large number of domestic and foreign literature research and investigation to visit the domestic map review system reform frontier cities,learn their reform direction and management path of digital multi-map joint review,and gradually explore a set of digital multi-map joint review mode suitable for the actual situation of Xuzhou.Construction drawing examination reform in xuzhou area as the research object,according to the construction of information platform as the goal,by comparing the advanced regional digital parallel review practice find xuzhou construction drawing review of the existing problems and the cause of the in-depth analysis,and by strengthening the organization construction,set up a digital system platform,strengthening the matter later regulation "the work of new measures to implement the drawing review the whole process of electronic management.The second,starting from the demand orientation,through the construction project of digital photos couplet on the content,characteristics,carding process,etc,to gradually build digital photos review system.through the analysis of digital photos united review workflow,function module design,according to the operation requirements,many nonfunctional characteristics of system requirements.Thus,the overall design of the system is completed,and the structural design,functional design and overall implementation of the system are elaborated,which lays a solid foundation for the subsequent platform optimization and promotion.Then,through detailed investigation and research,the problems existing in the actual operation and management of the digital drawing review platform were collected and analyzed.The 5M1 E analysis method was used to analyze the causes of the problems from the perspectives of system construction improvement,process optimization and service measures.Finally,the corresponding optimization countermeasures are put forward from the six aspects of enhancing the quality management consciousness of all parties involved in the digital drawing review mode,the overall service efficiency of the system,the quality and safety of the survey and design document submission,and the improvement of the supervision system construction,which provides a clear working idea for the further optimization of the digital multi-drawing joint review system.The research of this paper provides reference and reference significance for solving the innovation direction and new path of the construction project drawing review reform,provides a new idea for the construction of the digital multi-drawing joint review platform,helps to improve the application level of the digital multi-drawing joint review mode,and provides experience for the next step of nationwide promotion. |