Font Size: a A A

Study On Cost Control Of Pavement Improvement Project Of Ada Line

Posted on:2019-08-04Degree:MasterType:Thesis
Country:ChinaCandidate:X G GuoFull Text:PDF
GTID:2439330596961536Subject:EMBA
Abstract/Summary:PDF Full Text Request
Highway is an important part of the national economy and plays a pivotal role in the development of the national economy.It is of far-reaching significance to study the cost control of highway engineering,establish the market environment of sustainable development,and improve the survival and development ability of highway construction enterprisesThis paper takes the road surface improvement project of the Aida Line as the research object,discusses the problem of cost control of highway engineering,and puts forward the cost control measures of project cost control in conjunction with the construction cost plan of highway project,and optimizes the cost management of project project cost.Establish a more scientific and reasonable cost control system for engineering projects.On the basis of defining the concept of the highway construction project cost,analyzing the cost influencing factors of the highway construction project,clarifying the cost control principles and control contents of the highway construction project,and summarize the foundation of the Ada circuit surface reconstruction project and its project design plan and project construction content.On the basis of the earned value analysis method to analyze the current situation of project cost and progress,analyze the current problems and causes of the project cost control,and implement the whole process of cost control,sound responsibility and responsibility for the actual implementation of the Ada line surface reconstruction project.Combine the target responsibility mechanism,control the direct cost of the project,strengthen the project cost accounting and management,strengthen the quality management,etc.,and propose the project cost control measures,and then control the cost from the four stages of construction bidding,construction preparation,construction process and completion acceptance.And build the project project cost control system accordingly.Finally,realize the whole process of project cost,comprehensive dynamic management,and reduce cost targets.The above research topics can be used for reference to improve the cost control measures of the project.
Keywords/Search Tags:Highway engineering, Cost management, Control system, Cost account
PDF Full Text Request
Related items