Font Size: a A A

Research On Cost Control Of Highway Project Of Xiamen Branch Of CCCC Third Harbor Engineering Co.Ltd

Posted on:2014-03-02Degree:MasterType:Thesis
Country:ChinaCandidate:S X LinFull Text:PDF
GTID:2269330425460994Subject:Accounting
Abstract/Summary:PDF Full Text Request
Along with an increasingly competitive market of highway construction, it showsa situation that there’re less opportunities for more construction companies gradually,so the low bid has become a common means of winning the bid for constructioncompanies. What’s more, construction companies pay less attention to the cost controlof highway projects resulting in high cost and low profits in long terms. In order toensure profitability, construction companies choose to sacrifice quality to reducecosts which leads to existences of shabby projects. Therefore, building an effectivecost control mechanism of highway project has become imperative to eachconstruction company. Based on the technical principles of economics, in this paperwe build a project cost control mechanism of technical and economical integrationthat combines technology and economic, which guarantees the realization of efficienthighway projects cost control.We discuss highway project’s current situation and existing problems of costcontrol of Xiamen branch of Third Harbor and analyze the causes and we think it’snecessary for Xiamen to build project cost control mechanisms of technical andeconomical integration in this paper. We also introduce the building principle andmain function of project cost control mechanisms of technical and economicalintegration which laid the foundation for the application of this mechanism. Moreover,we apply this mechanism to highway projects of Xiamen branch of Third Harborwhich provide an effective solution to the technical and economic imbalances ofhighway project cost control key points, helping improve the cost control level ofhighway engineering project of Xiamen branch of Third Harbor. In order to ensure theefficiency of this mechanism, we propose improving suggestions on evaluations andincentives of cost control.In this paper, Xiamen branch of Third Harbor build a project cost controlmechanism of technical and economical integration that combines technology andeconomic and apply it to the cost control of highway project, highlighting itsadvantages, which is conducive to enhancing highway project cost control level.
Keywords/Search Tags:Highway, Cost Control, Technical and Economic Integration
PDF Full Text Request
Related items