Research On Key Issues Of Sponge City Renovation Project Management

Posted on:2021-04-22Degree:MasterType:Thesis
Country:ChinaCandidate:J K KangFull Text:PDF
GTID:2432330602471219Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
The sponge city pilot project is widely carried out in China,and project construction management plays a decisive role in the successful completion of the project.Therefore,this paper analyzes the key problems and risk factors that may exist in the construction process of the sea surface engineering reconstruction project through specific cases,and puts forward these problems.Control measures.This article first explains the basic theory of sponge city,comprehensively analyzes the advantages of sponge city construction and future development trends.It summarizes the history and application of foreign sponge city development,and summarizes the development of domestic sponge cities and relevant policies at the national level.Conduct a preliminary analysis of the risks existing in the construction of domestic sponge cities.Secondly,it introduces the general situation of the sponge project reconstruction project in X district of J city.During the construction of the project,innovative research was conducted on the current construction technology problems of the sponge city construction and applied to the construction process to promote the smooth construction of the project.Thirdly,using the brainstorming and defier method risk identification methods to assess the risks in the management process of the sponge project renovation project in X district of J city.Finally,according to the key risk assessment results,in the project construction management process,for the key issues of project management,construction quality management,construction total progress management,construction process safety management,construction process environmental protection management,and construction process peripheral relationship coordination management were formulated.,Special seasons,rain,night and busy construction management measures to reduce project construction risks and ensure the smooth completion of the project.This study enriches the existing research results and enhances the importance of project managers on key issues.By evaluating key issues and risk points in advance and taking effective measures,the smooth implementation of the sponge project renovation project is ensured.The research on the key issues of the sponge project renovation project in X District of J City provides management advice for project managers,which is helpful to improve theeffectiveness of management decisions,promote the smooth completion of the project,and provide reference for the management of subsequent similar projects.And reference.
Keywords/Search Tags:sea surface engineering renovation, project management, key issues, risk identification
PDF Full Text Request
Related items