Research On The Schedule Management Of The Hongdao Convention And Exhibition Project

Posted on:2019-02-06Degree:MasterType:Thesis
Country:ChinaCandidate:X M QuFull Text:PDF
GTID:2432330566989775Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,our country is one of the largest construction markets in the world,a large number of engineering construction practices urgently need to carry on the thorough research and the promotion to the construction project management theory and the method,the time limit management is the important part of the project management.The effect of time limit management has a decisive effect on the success or failure of construction projects.Large public construction projects with tight construction periods are generally characterized by large volume of construction,complex technology,various working procedures,high requirements for construction quality,and so on.It is very difficult to manage the construction period,so how can we make the scientific and feasible project planning in the construction period management of the large public construction project which is especially tight in the construction period,and ensure the construction project according to the construction schedule? The completion of the period will be of particular significance.This paper takes the time limit management of Hongdao exhibition project as the research object,combines the actual situation of the project,applies the theory,method and tools of the project management,and analyzes the work breakdown structure of the main activities of the Hongdao exhibition project.Optimize the adjustment,divide the construction area,find out the breakthrough direction of the Hongdao exhibition project duration management,determine the key path of the project duration management,under the technical guidance of the schedule plan control chart,The key processes on the main control line can be optimized and compressed by improving the construction technology or construction deployment,optimizing the key lines,changing the construction sequence,and strengthening the connection and penetration of the working procedures.Plug in;thus reduce the working time,and work out a scientific and feasible project planning.By using the scientific method of time management,it opens up the idea for the period management of the Hongdao Exhibition project,works out the feasible schedule and safeguard measure in the period of contract requirement,shortens the construction period of Hongdao exhibition project,and provides the guiding basis for the control of the schedule plan of Hongdao exhibition project.At the same time,the research of this paper provides a useful reference for the construction period management of the large-scale public construction projects with special duration.
Keywords/Search Tags:Hongdao exhibition project, work breakdown structure, area division, schedule control, key lines
PDF Full Text Request
Related items