Font Size: a A A

Research On Bidding Management Of Weifang Y Project Landscape Engineering

Posted on:2019-11-14Degree:MasterType:Thesis
Country:ChinaCandidate:N LiuFull Text:PDF
GTID:2429330566489754Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,the construction project of our country is in the stage of rapid development,and the construction of the people's heart is accelerating,which provides a more convenient life for the people.In infrastructure projects,the tender is an important work for the early management link,a structure connecting ecosystem and individuals for the overall construction success or failure of important role,is the domestic construction market gradually perfect the standard,the key of the planned economy gradually transition to market economy,to the project cost control and the improvement of the quality has great significance.This paper firstly introduces the definition,process of construction project bidding and the specific process and method of bidding in different modes.Then to a key project in weifang Y project bidding for typical cases,the choice in the process of its implementation of the bidding model and concrete scheme analysis,summarizes the current common bidding mode and existing problems of the favorable aspects: landscape design major difference is bigger,makes it the effective connection at the same time to play to their respective characteristics,is not conducive to the design quality of ascension;The design standard and the boundary blur,bring certain difficulty to project management and construction party;The enforceability of the mandatory terms is low,resulting in an increase in settlement time;The quantity of drawings is large,and the level of unit qualification cannot meet the requirements.This paper discusses the problems existing in the bidding process,and puts forward the improvement countermeasures: the early work should be solid,the construction plan scientific and reasonable;Take full consideration of the scale of each major and related project;The design deliverable time is as unified as possible,ensuring that the bidding task can be realized in one time;The bidding plan and method are as reasonable as possible to ensure the smooth progress of the whole project.To solve problems with the point of contact,strengthen supervision,improve professional quality,and lay a foundation for further development of bidding management.
Keywords/Search Tags:The bidding management, Project bid, The bidding model, Standardized management
PDF Full Text Request
Related items