Font Size: a A A

C The Tier-one Branches Of The Construction Of Information System Of Disaster Preparedness Center Bank Research

Posted on:2018-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:B Q XieFull Text:PDF
GTID:2428330542989879Subject:Information management and information system
Abstract/Summary:PDF Full Text Request
Financial data,money is a matter of days,5 minutes once a bank system,all the bank's business will be affected;If the interrupt 1 day,will influence greatly on bank credit,and will produce great financial risks;If the interrupt more than 2-3 days,the systemic financial crisis and even threaten social stability,to neglect the ultimate defense disaster.So as a branch of the financial system,face is a line of customers directly,if the system interruption,will bring what kind of impact In the face of sudden disaster,branches of institutions and how to cope In order to ensure the security of bank business continuity and data,the construction of the tier-one branches of disaster preparedness center become the banking information security priority,therefore,the research level of commercial bank branch information system of disaster preparedness center building,have very strong realistic meaning and practical value.This article first from C bank branches at present situation and the demand information system,this paper expounds the relationship with the business information system,by adopting a measuring model of bank information technology risk management,to confirm that the information system risk,and analysis from the Angle of supervision and the necessity of the construction of disaster preparedness center.Second detailed formulated the tier-one branches of disaster preparedness center bank of C building plan,understand at various stages of the construction of the disaster first,identify the relationship between disaster recovery and business continuity,disaster mode choice,to determine the content of the disaster,and the disaster data center construction research is divided into:computer room planning and deployment,realize the computer room design and deployment of standardization,network using open shortest path first(OSPF)and the border gateway router(BGP)to realize the network routing switch to a branch of the business development to provide a high performance,high reliability of network platform,information system is based on the LUN technology research,improve the availability of the overall disaster preparedness system.Finally,disaster management is a whole system of disaster,the disaster recovery strategy,disaster preparedness switching mode,and proposes the disaster recovery plan and operational management center for the recovery of research methods,and based on the theory of lean six sigma expounds the whole data center management style,at the same time combined with technology and management of the tier-one branches of disaster preparedness center construction bank C analysis and evaluation on the overall efficacy,and disaster preparedness center puts forward the prospect of future development,so as to other national joint-stock commercial Banks of the construction of the tier-one branches of disaster preparedness center for reference.
Keywords/Search Tags:bank information, disaster, business continuity, building research
PDF Full Text Request
Related items