Evaluation Research On The Whole Process Control Of The Cost Of Repair Projects In Local Universities

Posted on:2021-05-16Degree:MasterType:Thesis
Country:ChinaCandidate:C L YangFull Text:PDF
GTID:2392330626966056Subject:Engineering
Abstract/Summary:PDF Full Text Request
The entire process control of the cost of repairing projects in colleges and universities is based on the characteristics of concentrated construction time,technical complexity,difficulty in coordination,high requirements for comprehensive quality management personnel,and limited repair costs in the repairing projects of colleges and universities.Research to find out the main factors that affect the cost of repair projects,and focus on the main factors to reduce the cost of future repair projects,so that the repair funds do not exceed the expected and approved maximum amount,and ultimately promote the sustainable development of universities At present,such research is more extensive.However,the research methods at this stage mainly analyze the factors of out-of-control of the cost of university repair projects through literature research and analytic hierarchy process.It is difficult to provide a comprehensive and effective cost-wide process control evaluation mechanism and practical methods.There are certain limitations,so through literature research,analytic hierarchy analysis combined with field visits,factor analysis and fuzzy comprehensive analysis,on the premise of the characteristics of a large number of local colleges and universities,combined with the whole process of local college repair project cost control It is particularly important to analyze the influencing factors,construct a set of reasonable index system and evaluation method to evaluate it in order to provide a reference for the scientific and systematic control of the whole process of repairing project cost in local colleges and universities.The thesis analyzes the current status and influencing factors of cost control at different stages of the implementation of local university repair projects.Based on the analysis and determination of influencing factors,it constructs a local university repair project cost process control evaluation model and applies it to actual projects for verification.The main research content And the results are as follows:(1)Through literature research,field investigation,and analytic hierarchy process,combined with the characteristics of local universities 'repair projects,the status of the whole process control of local universities' repair projects is studied,and the influencing factors of the whole process control of cost are analyzed.(2)Optimized analysis of the first-level evaluation indicators based on the analyzed influencing factors.First,the first-level evaluation indexes of the evaluation indicators were optimized and analyzed based on the expert interview method,and the first round of selection of the evaluation index system was made.Then,based on the questionnaire survey method,SPSS software was used The data was factored,and the second round of evaluation index selection was made to determine the construction of the evaluation index system.(3)According to the qualitative indicators of the whole process of local university repair project cost control,the evaluation indicators contain fuzzy information and othercharacteristics,the fit of the evaluation method and the weight determination method is considered,and finally the comprehensive evaluation of the fuzzy comprehensive evaluation method combined with the analytic hierarchy process is adopted to establish the university The fuzzy comprehensive evaluation model of the whole process control evaluation of the repair project cost,and the evaluation of the actual case,the evaluation result is consistent with the actual situation of the project,and has achieved good results,which provides a reference for the management and institutionalized management of the repair project in local universities.
Keywords/Search Tags:Local university repair project, cost control of the whole process, influencing factors, AHP, fuzzy comprehensive evaluation
PDF Full Text Request
Related items