Font Size: a A A

Research On Risk Management Of Airport Construction Engineering Project

Posted on:2021-05-26Degree:MasterType:Thesis
Country:ChinaCandidate:H J HuFull Text:PDF
GTID:2392330602478927Subject:Project management
Abstract/Summary:PDF Full Text Request
With the progress of information technology and economic globalization,people are faced with more and more choices and wide coverage,The transportation industry naturally maintains a very rapid development momentum.As the transportation industry with the most scientific and technological content and the most modern trend,civil aviation transportation plays an important role in ensuring the safe and convenient travel of tourists.However,the airport construction in China is obviously lacking,which is far from the European and American countries.China's government and aviation enterprises are extremely concerned about it.In the future,we will enhance policy support and strategic guidance,promote the development of new infrastructure,reconstruction,expansion,and the aviation industry has entered the key of industry development and transformation.However,the investment in airport construction is very high,and it is very difficult.In China,there is a lack of construction experience in this kind of large-scale project,especially in the aspect of risk management.As one of the factors in the process of airport expansion,risk management has become the key to whether the construction project can be completed properly and orderly.Therefore,a series of risk management around the improvement and expansion of civil aviation airport has become the focus of the industry.Based on the theory of risk management and the actual situation of the current construction industry,this paper studies the risk management of the second phase reconstruction and expansion project of Jinggangshan airport.Firstly,according to the current actual situation of Jinggangshan Airport Phase ? reconstruction and expansion project,the necessity of risk management is accurately assessed;secondly,according to the steps and principles of risk identification,the risk factors of the construction project are analyzed,and the possible risks at the current five levels of technology,construction,management,safety and economy are clarified;common At the same time,the analytic hierarchy process,fuzzy comprehensive evaluation method,expert evaluation method and matrix calculation method are used to further carry out scientific and practical specific research on risk factors,so as to truly quantify the risk situation and evaluate the specific data.Finally,the corresponding management guarantee measures and risk response strategies are proposed according to the risk assessment results.Based on the current situation of Jinggangshan Airport Phase ? reconstruction and expansion project,this paper attempts to study the risk management problems with the support of risk management theory and put forward guidance measures,hoping to help the construction project avoid risks as much as possible,control losses,and provide more important theoretical supplement and practical reference for the Research of China airport construction project reconstruction and expansion risk management.
Keywords/Search Tags:Jinggangshan airport, reconstruction and expansion, risk identification, risk control
PDF Full Text Request
Related items