Font Size: a A A

Research On The Operational Risk Management Of Phase ? Project In Huanghuaport Coal Terminal

Posted on:2019-02-13Degree:MasterType:Thesis
Country:ChinaCandidate:B Z SunFull Text:PDF
GTID:2392330596463434Subject:Engineering
Abstract/Summary:PDF Full Text Request
For remaining invincible position,port enterprises should set up enterprise brand image and core competitiveness.Risk management,as a long-term and arduous task,has always run through the whole process of wharf operation,and must be paid attention to it.By establishing a standard and effective risk control system,improving the ability of risk prevention and reducing the risk loss,enterprises should ensure safe and steady operation,which is of great significance to the development of port enterprises.The fourth phase of Huanghua Port Coal terminal Project is subordinated to Shenhua Group,which has the largest mining area with rich reserves,good quality,scientific management,advanced technology,and outstanding efficiency and benefit.With satisfying stable and growing domestic and foreign market demand,that project has significant impact on ensuring domestic coal supply and expanding the foreign trade export market of coal.Based on the fourth phase of Huanghua Port Coal terminal Project,risk management research is carried out in this paper.Firstly,the domestic and international research status of risk management is introduced,the content and method of the research is confirmed.The research is carried out based on related theories of risk management.Then the operation status of the fourth phase of Huanghua Port Coal terminal Project is introduced.After the analysis of waterway,berthing,loading,transportation and storage,the risk system of operation is established and comprehensive evaluation of it is conducted by the use of AHP,fuzzy comprehensive evaluation method.Finally,according to the characteristics of the fourth phase of Huanghua Port Coal terminal Project and related theories of risk management,it will be helpful for the control of existing risk factors in the operation management,it will be helpful for putting forward control measures and improving anti-risk capability of Huanghua Port,it will be helpful for summarizing and advancing the innovations of this research.Therefore,the operation status of the fourth phase of Huanghua Port Coal terminal Project is analyzed from the perspective of risk management and the risk control measures are put forward with the development of risk management.It will contribute to coping with the intense market competition and establishing theoretical support for the Group.
Keywords/Search Tags:Huanghua Port, the fourth phase, operation risk, risk management, risk control
PDF Full Text Request
Related items