Progress Control Of The Elevator Installation Project In The Super Highrise

Posted on:2019-01-25Degree:MasterType:Thesis
Country:ChinaCandidate:Y PanFull Text:PDF
GTID:2392330590492095Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of science and technology and the level of construction design,the super high-rise buildings have been spread widely in many cities throughout the country at present.As a necessary vertical transportation tool for high-rise buildings and infrastructure,The market demand of elevator is still increasing.Weather the progress goal of the project can be realized is related to the vital interests of all the parties in construction.The project progress management is the key point of each project.So,for the elevator company,It is important to strengthen the management of the site installation progress of the project.The research object of the thesis is the elevator installation project in the super high-rise.The research content are the progress planning and control methods.According to the project characteristics of super high-rise buildings,the author analyses the management experience of past projects and points out the problems existing in the process of elevator project management in super high-rise buildings.With the help of the key date method,network planning diagram and the information management software,optimize of the schedule of Elevator Engineering.A set of schedule control method for elevator installation in super high rise project is set up.From the three stages of the project management process,several key nodes that may affect the progress of the project are selected.A series of control and preventive measures have been developed.So that it can protect the schedule of the project from the factors such as planning,construction coordination and site coordination.Finally,the actual case is used to verify the effectiveness of the progress control method for elevator installation engineering in high-rise buildings,which provides a reference for future related projects.
Keywords/Search Tags:Elevator, Progress Management, Planning And Controlling, Key Date Method, Network Planning Diagram
PDF Full Text Request
Related items