Study Of DSCV MT6027 Living Quarters Design Project Schedule Management

Posted on:2019-06-17Degree:MasterType:Thesis
Country:ChinaCandidate:J Q YangFull Text:PDF
GTID:2392330590478799Subject:Project management
Abstract/Summary:PDF Full Text Request
Ship design work is the foundation of ship construction and the first work of ship construction.The length of the ship's design cycle directly affects the ship's construction cycle and determines whether the shipyard can deliver the ship on time.At present,China's ship design is facing the difficult problem of low industry management level and long design cycle,which can not effectively manage the ship design progress.It has become urgent to implement effective progress management and shorten the ship design cycle for ship design project.Each ship will have a living quarters design,and the living quarters design is the last design work of the ship design.It directly affects the length of the design cycle.Based on the above research background,this paper studies the MT6027 living quarters design project with the diving support ship MT6027 living quarters design project(full text: MT6027 living quarters design project)as a case study of progress management.This paper uses literature analysis and case analysis to analyze the problems,current situation and influencing factors of MT6027 living quarters design project progress management,and provides the theoretical basis for the preparation,management and control of MT6027 living quarters design project progress planning.Through studying the progress management of MT6027 living quarters design project,we will solve the progress management problems encountered in the implementation of MT6027 living quarters design project,improve the level of ship design project progress management,shorten the ship design cycle,and win more time for ship construction.At the same time,it also demonstrated the progress management of other projects of CMHI,laying the foundation for CMHI to carry out progress management.The first chapter introduces the research background and significance of MT6027 living quarters design project,foreign literature research,research significance,research purpose,research content,research method and technology.The second chapter introduces the concept of project progress management,the method and principle of project progress planning,and the basic theory and method of project progress management.Through integrating the knowledge and methods of project progress management,the second chapter provides the basis for the study of MT6027 living quarters design project progress management.The third chapter mainly introduces MT6027 living quarters design project progress management characteristics,progress management goals,progress management status quo,progress management internal and external management issues,MT6027 living quarters design project progress management necessity.The fourth chapter comprehensively manages the progress of MT6027 living quarters design project from three aspects: the preparation of the progress management plan,the implementation of MT6027 living quarters design project progress management,and the MT6027 living quarters design project progress management guarantee measures.Chapter 5 is the conclusion,including the conclusion and prospect.
Keywords/Search Tags:MT6027 Living Quarters Design Project, Schedule Management, Plan, Safeguard Measure
PDF Full Text Request
Related items