| The design and review of construction drawings of construction projects plays an important role in improving the quality of construction projects and standardizing the order of construction market.The timely treatment and correction of problems found in the examination of drawings can effectively guarantee the quality of projects.Due to the complexity and diversity of architectural design,there will still be many omissions and omissions in the specific engineering design,which will affect the improvement of engineering quality.The quality of the construction drawing review will directly affect the construction drawing documents and the final quality of the building.Therefore,how to improve the inspection quality of building construction drawing is of great significance in building construction.For China’s long-standing tradition of artificial construction drawing design documents review the malpractice and the low efficiency of the problem,in order to solve such problems,this paper tries to through the Japanese construction preparation stage of the review process and after management mode,compared with China’s present situation,from the management strategy to the more specific measures of construction drawings and after check were discussed,and hope to in the fierce international competition environment have contribution to the Chinese construction enterprises,to promote its healthy development,improve the competitiveness of the enterprises.This paper mainly starts with the significance and background of the research on construction drawing review and expounds the general situation of construction drawing review in China and Japan at the present stage.In China at this stage in the building construction drawing examination system and the present situation of the construction management aspect and Japan at this stage in the building construction drawing examination system and research status quo of the construction management,further summarizes the problems existing in the construction plan review in China and Japan in terms of review and management practices and the system can be drawn lessons from.In the end,combining with the example of construction project in Japan,the concrete operation method of construction drawing review and management in Japan is illustrated.Comparing the review and management of construction drawings in China and Japan,this paper puts forward the methods that China can further improve the review system of construction drawings at the present stage. |