Font Size: a A A

Study On Construction Management Improvement Of Weak Current Project In Shanghai X Hotel

Posted on:2019-03-05Degree:MasterType:Thesis
Country:ChinaCandidate:H N HuFull Text:PDF
GTID:2382330572950590Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the continuous development of real estate,real estate developers have derived new commercial complexes of real estate,and high-end hotels are increasingly accepted by ordinary consumers.The overall design of the hotel in the weak current engineering is particularly important,not only can reflect the quality of the hotel,is also the important of the hotel management system,intelligent building,make people's working environment,living environment,consumption environment,from the concept of a qualitative leap,high degree of intelligent hotel has become a modern business people pursuit of ideal requirement.For a modern star-rated hotel,management is a huge and complex system engineering.Only through effective control and management of each weak current subsystem of the intelligent system,can effective management of the entire building environment be realized.Through the reasonable application of the weak current technology,we provide guests with a safe,comfortable,convenient,environmental-friendly and informative living environment.The hotel project is an international leading product with large overall investment and high technical requirements.The intelligent part of weak current is the international leader,adopting a lot of independent innovation technology.The novel intelligent system not only provides better service for the hotel,but also can increase the decoration effect through the projection equipment.The four-storey Japanese dinner creates the effect of changing the four seasons through 11 projection devices,and realizes the interaction with customers through infrared induction,making customers have the feeling of being in the nature.Every business type in the hotel USES intelligent management to participate in operation management.From management software to intelligent control,it constantly highlights the importance of intelligence in the contemporary era.Author X hotel Shanghai is one of the major persons-in-charge of the weak current engineering project construction management work,combined with the authors practical work experience related to project management theory,using the method of theory with practice,the X hotel Shanghai weak current engineering management in the analysis of existing problems,respectively,for the project quality,safety,cost,schedule four aspects to improve,and finally put forward the improvement scheme of implementation and improvement.
Keywords/Search Tags:Weak current engineering project, Quality management, Safety management, Cost management and schedule management of X hotel Shanghai
PDF Full Text Request
Related items