Research On The Risk Management Of Steam Convert To Power Project Construction In WTE

Posted on:2019-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:L JiaoFull Text:PDF
GTID:2381330599977595Subject:Project management
Abstract/Summary:PDF Full Text Request
Weihai Environmental Regeneration Co.,Ltd."WTE Company"(Waste To Energy),because the project is only for the waste incineration steam supply project can not be sold in the summer,it is necessary to reduce the load production,It is necessary to consider the construction risk management factors of general construction projects.Attention should also be paid to the particularity of the harmless treatment of MSW incineration.The risks in WTE's steam power transformation project directly affect the smooth progress of the project.WTE's steam power transformation project is an important factor for the stable survival and strategic development of the enterprise benefit.To ensure that the use of existing resources into treasure,has extremely important economic value.WTE Company's Steam power Project is an important guarantee for the stable survival and strategic development of enterprises,and it is of great economic value to make use of the existing resources.Problems of the steam power conversion in the company,uses the brainstorming method to identify the project risk,and determines the project risk identification list by identifying the internal and external industry experts,meeting matters and meeting of Weihai WTE Company,which can be used for risk assessment,The risk response strategy and other follow-up studies lay the groundwork.As an important part of risk management,risk identification and evaluation is the precondition of controlling risk measure design,so the identification and evaluation of the risk of WtE company is of great value to the risk management of the project.Research 10 external peer experts,after the project risk assessment,the project risk assessment results of a brief analysis.In addition,there is a need to focus on the high risk to further take a risk response.In the research of the risk evaluation of the steam power project in Weihai WtE Company,the project risk probability is determined by Delphi method,the project risk grade standard is determined by the quantitative product calculation of the risk occurrence probability and the consequence of the project,and finally,the project risk identification list is determined for the medium and high risk strategy.The list includes 7 levels of risk and 22 level two risks.WTE Company's steam power project to the organization Management Risk,fund management risk,quality management risk,safety management risk,time limit risk,natural and environmental risk,social stability risk of a set of measures strategy.It has important guiding significance for the implementation of WTE company's steam power project,and it has some reference value for the research of risk management of similar projects.
Keywords/Search Tags:garbage incineration, steam electric circuit, project construction, risk management
PDF Full Text Request
Related items