Font Size: a A A

The Development And Post Evaluation Of Safety Production Risk Management And Control System For The Operation Of The Power Supply Enterprise

Posted on:2018-06-29Degree:MasterType:Thesis
Country:ChinaCandidate:H J ShaoFull Text:PDF
GTID:2359330518955518Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years,as the State Grid Corporation of China constantly improves the practices and regulations of infrastructure work safety management and construction project safety management,the project safety management standardization is steadily advancing.However,the project construction still has many problems in safety management.Therefore,the safety of power grid construction and production has been highly valued by the government.In order to effectively prevent the construction safety accidents and strengthen the safety management of power grid projects,the State Grid Corporation proposed a number of continuous revision on strengthening infrastructure safety management measures and regulations in recent years,and also actively promoted the standardization of project management.In addition,the safety management of power grid construction projects in the design,construction and project should be put into operation in all phases with the standard requirements to promote the standardization of power grid engineering construction.The essence of the safety production management is the safety risk management and the core of the safety risk management is the safety risk assessment.In order to further implement the risk management requirements,enhance the ability of risk managem ent and control of production safety,this paper combines the present situation of power grid companies,analyzes the demand factors of safety risk control project of county-level power supply enterprises and discusses the business processes and data flow system.Then,according to the system design principles,a frame system structure is established and the control system of risk evaluation index system is analyzed.Next,the system database,input and output are designed after analysis of the system hardw are to software environment.Finally,the matter-element model of evaluation is constructed and proves the validity of this system.
Keywords/Search Tags:Power Grid Company, operation project, risk management and control, working team
PDF Full Text Request
Related items