Font Size: a A A

Research On The Optimization Of Order-based Small-volume Project Management Process For Xaar Pump Manufacturers

Posted on:2012-01-22Degree:MasterType:Thesis
Country:ChinaCandidate:W W ZhouFull Text:PDF
GTID:2359330374489598Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Order low-volume manufacturing of its industry and product characteristics, often confronted with the various users' individual needs, product standardization in the manufacturing process, less common, the study of its execution of this contract can not be limited to the production study of the manufacturing process.In this paper, the mechanical manufacturing of domestic production of small-order execution of the contract process briefly. Small quantities of domestic manufacturing orders for execution of the contract process commonly used to functional organizational structure based on functions of management. Foreign manufacturing enterprises during the execution of the contract is more than the introduction of project management techniques, using a project management based contract execution.By domestic enterprises,"Purcell pump", European companies SIEMENS AG, Germany's business characteristics, organizational structure set up, execution of the contract process and execution of the contract description and analysis of domestic and foreign enterprises to further clarify their different characteristics of the process of execution of the contract.In comparative analysis,"Purcell pump" and SIEMENS AG products in small batch-order process and results of implementation on the basis of the existing project management Purcell pump operating mode on what the problem is, the final race in detail how should the contract Seoul pump project management organization set up, contract project management processes and plans, contract management, project control, project management, evaluation and contract ending and several other aspects of optimization.Contract project management techniques can enhance the execution of the contract process planning and control, improve the management efficiency of execution of this contract, effective and rational use of corporate human resources, funds, equipment and other scarce resources. For improving the integrated management of domestic manufacturing enterprises of great significance level.
Keywords/Search Tags:Manufacturers, Small quantities, Project Management Processoptimization
PDF Full Text Request
Related items