| The promulgation and implementation of the "Construction project Resilience Detailed list Valuation Standard" (GB50500-2003), symbolizes that our country construction project construction cost valuation model's significant transformation, Construction will cost, bidding, construction companies and the tender offer and management have a significant impact evaluation work for a new challenge. However, due to people affected by the traditional model of pricing and the impact of the habit, with the result that engineering bill pricing norms in the bidding of the project has not been fully applied.This article first introduced the domestic and international bidding for construction of the development of the history and current situation, and then analyzing the traditional construction tender process and the main problems, should be vigorously Quantities tender. In discussing the merits of Quantities tender, it also pointed out that the implementation of Quantities tender urgent need to explore should be made to develop and offer Quantities suited to the new evaluation methods. In the last few years, the reform and development of construction industry research report as the basis for, combination of enterprises and institutions in bidding for the actual situation, from the overall interests, analyzed the current status of bidding and tender documents do not have a strong targeted, unfair competition, as well as corporate tender evaluation of the main reasons such as inadequate, on the issues of in-depth analysis and research, and within a reasonable analysis on the basis of the corresponding countermeasures.Finally, the future of Quantities tender was discussed, according to China's construction industry of the status quo, pointing out that the current tender with the current market mechanism and with the accession to the WTO after the opening round at various levels can not meet the requirements, and the use of The new tender is to change this situation, one of the best methods and analysis of the bid without the full implementation of the tender should be noted that a number of key issues of Quantities tender and the risk of preventive measures. |