Research On The Progress Control Of Beautiful Rural Planning And Design In Wuyun Mountain

Posted on:2018-04-30Degree:MasterType:Thesis
Country:ChinaCandidate:X Q YaoFull Text:PDF
GTID:2352330536952522Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
Beautiful countryside construction project is integrated regiona l urban and rural development,improve the level of new rural construction.Beautiful countryside is China's key support,the rapid development of the industry.Beautiful countryside planning and design is a beautiful rustic building an important part.It is the role of the entire life cycle of the construction of t he beautiful countryside in cannot be ignored.Although the beautiful countryside construction model made some achievements,but also subject to many conditions,such as: the beautiful countryside planning project schedule could not be delivered on schedule,resulting in project delays,it is bound to affect the overall increase in construction costs,not only affect the overall project income,delayed the whole process of rural construction.From the beautiful countryside planning and design project schedule management concept,the first introduces the beautiful countryside planning schedule control basic situation and characteristics,about the beautiful countryside Planning Progress Control importance in the project.Beautiful countryside for planning research schedule management,and project progress control is analyzed,and the beautiful countryside Planning Project Control mode.Firstly,the paper discusses the restriction factors influencing progress control in project planning and design beautiful countryside,on constraints generated by the analysis and propose measures to deal with constraints.Then according to schedule control theory,the progress of the planning system in the beautiful countryside planning project schedule control,set the goal of beautiful countryside planning and design projects,according to the characteristics of beautiful countryside planning and design projects,the use of WBS method for the entire project is decomposed by dependencies between activities determine the sequence of events,the use of PERT,analogy and expert estimation method to estimate the time for each activity,draw a network diagram beautiful countryside planning and design projects using computer software to determine the network diagram its critical path,based on the allocation of resources for each activity and the start and finish dates,the preparation of scientific and rational project planning,control and management mechanisms to establish progress in project implementation,project schedule control.Through the development of effective regulatory measures in order to guarantee the smooth implementation of the project schedule.In this paper,according to the case of Henan Yingyang Wuyun Mo untain Planning and Design Project,this paper analyzes the progress management model of Wuyun Mountain case by using the proposed planning system of beautiful rural planning and design,and validates that based on the work decomposition method,technical review technique and critical path method Of the progress of management methods,is a more effective scientific method to ensure that Henan Xingyang Wuyun Mountain planning and design projects completed on time.
Keywords/Search Tags:Schedule Management, Work Breakdown Structure, Critical Path Method, Program Evaluation and Review Technique
PDF Full Text Request
Related items