Font Size: a A A

Study On Post Evaluation Of Capacity Building Project In AN Oilfield

Posted on:2017-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:X DaiFull Text:PDF
GTID:2349330488960487Subject:MBA
Abstract/Summary:PDF Full Text Request
The main purpose of the project post-evaluation is to check whether the decision-making process of the project is scientific, whether the investment is expected to benefit, whether the construction and operation management is compliance with the law, whether the project has a sustainable vitality, whether the ability to circumvent the market risk is effectively established. The key point is to sum up the successful experience and learn from the failure. Put forward the improvement plan for the operation of the project itself, for other projects to provide a reference for the decision- making and management methods. Can also be combined with the social and economic situation to amend the existing management regulations to put forward effective proposals to improve the whole industry project decision- making and management level.AN oil field is a new oil field in the million ton oil field discovered in the periphery of Daqing in recent ten years. The production capacity building of AN oilfield is of great significance to the stable and sustainable development of Daqing oil field. But the oil field production capacity construction project has the characteristics of high investment, large amount of project, high risk, resource control and production, and the production cost increasing. Therefore, it is necessary to evaluate the project.This paper summarizes the current situation of domestic and international project post evaluation research, and expounds the basic theory related to the post evaluation research of the oil field production capacity construction project; according to the characteristics of oilfield productivity construction project, built for AN oil field project after the comprehensive evaluation index system, the construction of a productivity, After AN oilfield productivity construction project evaluation index system made up of three layers. Contains three first- level indicators, including stage after evaluation, economic evaluation, influence and sustainable post-evaluation, 10 secondary indicators, 33 three-level indicators. These indicators reflect the different construction stages in the process of oilfield production capacity construction efficiency and management level, for the construction project post-evaluation provides a full range of information. Through the questionnaire survey was conducted to the relevant experts get accords with the practice of construction of AN oil field production after the comprehensive evaluation index system of relatively important factor, Using the analytic hierarchy process to determine index weight, Successful degree fuzzy comprehensive analysis on the AN oilfield productivity after the construction projects for the integrated evaluation of case study, Finally, in combination with the practical operation of the project, analyze the project's success experience, puts forward reference to the existing problems of the opinion, and has some reference value for the development of similar oilfields in the future.
Keywords/Search Tags:AN oil field, productivity construction project, post-evaluation, fuzzy comprehensive evaluation
PDF Full Text Request
Related items