Font Size: a A A

The Design And Implementation Of The WM System Of Procter & Gamble Company's Cleaning Products

Posted on:2018-04-03Degree:MasterType:Thesis
Country:ChinaCandidate:Q S CaiFull Text:PDF
GTID:2348330569985821Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Warehouse management system is through the activities of purchase and storage,warehouse storage,sale of the library,financial management and other manners resolve the contradiction between supply and demand of inventory management saving the tedious of manual records and inventory which is the essential part of the link from production to sales to make sure the production smoothly,improving the operation efficiency of the commodity in warehouse management.After this management system establishes the database background by using MySQL SERVER 5.0,it is developed by the basis on Java language using JSP,JDBC and other technologies with the MVC three layers model and MyEclipse development tool,the program complete the management of the administrators,suppliers,product warehousing and other information.The design and implementation of the system mainly includearts: the development of foreground visual interface,the realization of the system control layer and the link and creation of the background database.The foreground visual interface is on the demand of the beauty,comprehensive function and easy to operate.The code parameters in the part of system control take English as the main and it is easy to read.The part of data storage is the whole integrity and high security.The whole system is based on the actual requirement of the Procter & Gamble Company.The overall design of the software development is based on the research,induction,summary and summary of the previous demand analysis.According to the customer's requirements for software function in the development of the software in general on the structure of the plan and design,clear software design ideas and database structure of the table.Completion mainly(The main finished task)includes system sub-function module design and database design.And the detailed design of the basic responsibility is to program detailed design;the development process of business to achieve a clear plan out,that is,after this stage can be clear and accurate coding will be carried out in an orderly manner,according to a clear idea to start the programming part of the program is developed.Through the system test to find out its shortcomings,which is to be modified and improved during this process,the error to a minimum to reduce the losses caused by the code to ensure the safety and vitality of the program Testing is indispensable.The system to solve the P & G clean supplies warehouse management issues,improve the core competitiveness in this part.
Keywords/Search Tags:Comprehensive query, Supply management, Warehouse management, Cleaning products
PDF Full Text Request
Related items