Research On Group Management Information System For Pumped-Storage Power Construction Project

Posted on:2018-10-12Degree:MasterType:Thesis
Country:ChinaCandidate:C L WeiFull Text:PDF
GTID:2348330518958119Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the high-speed development of internet and information & communication technologies,management information system has become an efficient supporting means for enterprise groups to improve their production and management levels.Compared with that of a single construction project,the management information system of a group will be confronted with bigger challenges in respect of coordinated management and control content.It is a typical problem for many group corporations to how to make efficient progress in the construction of group management information system and how to adapt to the needs of different management levels of group corporations.Due to the complicated management of pumped storage construction projects,under the background of the large-scaled development of pumped storage power construction in China,the practical needs become increasingly urgent to apply the management information system into the construction management of the Pumped Storage Project Construction Group.By the introduction to the construction process of the management information system of the Pumped Storage Project Construction Group,the article has analyzed the difficulties and needs in the construction management of the pumped storage power stations group,studied the relevant theoretical knowledge system concerning the construction of management information system,offered the application plans of the professional control technologies,such as intelligent temperature control,monitoring & control of the quality of construction roll compaction,and BIM on construction,into the project construction management.It has finally determined the general framework design and application plan for the construction of management information system of the Pumped Storage Project Construction Group covering SP Xinyuan Company,Ltd,project executors under construction,project designers,supervisors & constructors in order to enable the all-round management and control of the security,quality,schedule,investment and data,etc.on pumped storage project construction by SP Xinyuan Company,Ltd,and project executors under construction,and thus form an information system realizing the communication to outside from various levels including execution level,management level and decision-making level,etc.
Keywords/Search Tags:Pumped-storage power project, Group construction management, Management information system
PDF Full Text Request
Related items