Font Size: a A A

Design And Implementation Of National Grid Non-tender Procurement Management Subsystem

Posted on:2016-03-15Degree:MasterType:Thesis
Country:ChinaCandidate:J ChangFull Text:PDF
GTID:2348330512974890Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the accelerated pace of the economy,purchasing Management is part of the overall purchasing business,mainly includes contract management,supplier management,payments,etc.content management,relying on national Grid has the entire e-commerce platform,has completed the tender procurement management of electronic information,and has been widely used,while non-tender commodity procurement management can also be into them,so the development of the national grid non-tender procurement management subsystem,can better improve procurement management portion of the national grid,it is very necessary.Based on the needs of the national grid,design and implement a national grid of non-tender procurement management subsystem.Thesis,JSP technology,Struts framework,Hibernate technology and Oracle database etc.technology used,analysis system interface,user roles overall functional and non-functional requirements,and focuses on the detailed process design and implementation of protocol number management module,data management module catalog,purchase order management module.National Grid non-tender procurement management subsystem applications,improved integrated information service quality of procurement management system,improve the integrity of the information for the record,allowing users in the use of information have a more complete grasp,improve existing procurement processes and supply chain management,better promote the management level and service level of existing procurement management.
Keywords/Search Tags:Procurement Management, Non-Tender Procurement, Struts, Oracle, Hibernate
PDF Full Text Request
Related items