Font Size: a A A

The Research On The Risk Management During The 4G Base Station Project Of JS Bureau

Posted on:2018-12-04Degree:MasterType:Thesis
Country:ChinaCandidate:C L JinFull Text:PDF
GTID:2348330512967236Subject:Project management
Abstract/Summary:PDF Full Text Request
After China Telecom obtained 4G licence,how to manage mobile communication engineering project,reduce the risk of mobile communication engineering project as an important task to research on telecommunications company.Since the competition is increasingly fierce, traditional mode of operation has been unable to meet the needs of mobile communication engineering project market. Mobile communication engineering projects due to its own characteristics,facing more and more risk and uncertainty,risks caused by the loss of scale is becoming more and more big. Risk management level, as an important indicator to measure the level of project management,project management is to determine the core competitiveness of an important factor in the future, effective risk management will become the telecommunications companies a source of competitiveness.In this paper, combining the characteristics of the risk management during the project of mobile communication engineering, is studied by the theory of project risk management tools, and researched the engineering project risk management related basic theory, The implementation of risk identification, risk analysis, risk response and risk monitoring related process and concrete methods, put forward the implementation of project risk management is of great significance for mobile communication engineering project, Risk management is one of the telecommunications project management indispensable important aspect. In combination with a case of China telecom Shanghai JS bureau of 4G base station project, introduces the application of risk management theory, Risk is identified by check list, qualitative analysis and quantitative analysis are carried out.On the basis of risk analysis, the risk control strategy is researched, then put forward the risk response measures.
Keywords/Search Tags:Mobile Communication, Engineering Project, Risk Management, Base Station
PDF Full Text Request
Related items