Font Size: a A A

Study On Post Evaluation Of Communication Base Station Construction Project

Posted on:2017-09-04Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q XieFull Text:PDF
GTID:2348330488977952Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, driven by the relevant state departments, post project evaluation has been accepted by Chinese enterprises, especially the important project of national. China Tower is mainly responsible for base station construction. It has many characteristics, including: long project cycle, large investment, and unclear construction scope, it is necessary to carry out the work of post evaluation. At present China tower company in the base station construction project post evaluation has many problems, including the lack of professional organizations, the lack of a mature evaluation system, and qualitative analysis as the majority of post evaluation. Therefore, according to the characteristics of the project, the evaluation index of base station construction project is set up, existing evaluation methods are used, the post evaluation of base station construction project is carried out.In this thesis, embarks from the problems of the China tower post evaluation, based on post-evaluation of the base station, the evaluation system for base station construction is set up, evaluation method of each index is cleared, finally the actual post evaluation of base station construction project is carried out. The content of this thesis mainly includes the following two aspects:First, evaluation system of base station construction project is constructed. In the traditional project evaluation index system, while considering the basic content of the project, but cannot reflect the characteristics of base station construction project, therefore, combining with the contents and characteristics of base station construction project, the evaluation index system of base station construction project is constructed. In the base station construction goal, the time, quality, construction of the rule of law and the target content are analyzed, the target index is formed; the index of project implementation process, starting from the entire project life cycle, project organization, clear level and other aspects of analysis; in the economic aspect, the main profit and solvency analysis in the project; on the other hand, mainly from the aspects of analysis, including operators, social and electromagnetic environment. In the project of sustainable, mainly involves two aspects of scale and technology.Second, post evaluation methods are used. In the traditional project evaluation process, the evaluation method is single. In this thesis, based on the analysis of common evaluation methods, combined model is formed, a more flexible evaluation system is formed.
Keywords/Search Tags:Base station construction, post evaluation, comprehensive evaluation
PDF Full Text Request
Related items