Font Size: a A A

Study On The Financing Mode And The Risk Control Of Xiangya Changde Hospital

Posted on:2017-05-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q HuangFull Text:PDF
GTID:2334330491954803Subject:The MBA
Abstract/Summary:PDF Full Text Request
In the face of long-term planning target of capital requirements to hospital, we need to explore sources of funds, and to attract private capital. At present, the investment and financing policies of the project and the lagging of reform seriously restricted the development of hospital construction. At the same time, the existing financing mode can not solve the requirement of hospital's development, therefore, we need to design the financing mode of project to solve the bottleneck of funding for the hospital project. This paper first described the research background and research significance, and summarized the domestic and abroad research status, put forward the research ideas and the framework of this paper. It also explained the PPP project financing mode, the development process and related policies of PPP, and pointed out the characteristics of PPP financing mode. From the three aspects of outsourcing, franchising, private financing, it pointed out the main pattern of PPP, and from policy makers, investors, operators, item company, lenders, consumers, design units, construction units, suppliers, the insurance company and the third party, such as strategic advisor, it explained the different stakeholders and their responsibilities to PPP financing, and provided a reference for the design of the financing to Xiangya Changde hospital project. Then, the analysis of the background of Xiangya Hospital of Changde project, points out the necessity of Changde investment Xiangya Hospital Project of Changde City Economic Construction Investment Group, illustrates the basic situation of Xiangya Changde Hospital project, introduces the BOT and TOT (transfer-Operate-Transfer), DBFO(Design-Build-Finance-Operate) three kinds of common financing model and compared with the advantages and disadvantages of Xiangya Hospital of Changde project, to Xiangya Changde Hospital Project Financing Mode Selection:the TOT financing mode, and to the tot as the foundation, constructs the Ya Hunan Changde hospital project financing operation procedures. Then, on the basis of others research results, both qualitative and quantitative analysis, combined with management practice, the hospital project financing risk factors were analyzed, including the project economic risk, policy risk, characteristics of project risk, the risk characteristics of the participants 4 level index, and on the basis of survival risk, solvency the ability of the risk, profitability, risk, cost risk, financing risk, national laws and regulations of government incentives and regulatory policy risk, the government fiscal policy system of social credit risk, risk, project risk, project technical level of complexity, risk management of project financing risk, ability risk, operation risk, exit risk, finance supervision and conflict risk 15 two indicators were determined, and the quantization process and system level analysis, fuzzy comprehensive evaluation assessment The assessment results, determine the risk level of various factors, analyzes the Xiangya Changde hospital TOT project financing mode risk level, in order to control risk, provides the basis. Finally, according to the results of the assessment, in front of the risk analysis and assessment based, clear Xiangya Changde hospital project financing risk control of key and the key point, and accordingly proposed economic features of the project risk factor control, control system, risk, and policy factors, project risk characteristics for controlling and participants risk factors control measures, to prevent and control the financing risk.
Keywords/Search Tags:Xiangya Changde Hospital, financing model, risk assessment, risk control
PDF Full Text Request
Related items