Technology Research Of Nuclear Power Project Management Under EPC Mode

Posted on:2018-10-19Degree:MasterType:Thesis
Country:ChinaCandidate:S Y ZhengFull Text:PDF
GTID:2322330542987496Subject:Engineering
Abstract/Summary:PDF Full Text Request
It is the characteristics of Nuclear power plant that t large investment,long construction period,at the same time,nuclear power has the industry particularity,in terms of safety(including nuclear safety)demand is high,high social awareness,etc.In view of this,to establish a good nuclear power project management mode,make full use of project management tools,to build efficient,ensure nuclear safety,to reduce the economic costs,is particularly urgent.To make sure that it produce good economic benefit after normal operation of domestic nuclear power units,It should achieve the world nuclear safety level,and contribute to clean energy developing.Based on the concept of project management theory and the EPC general contracting mode,this article analyzes the management mode of nuclear power projects in the past and now in china,and the international management mode,for example the specific research for the French model,South Korea,the United States,Japan,etc.At the same time,the chinese first phase of Qinshan nuclear power project management mode,Daya Wan nuclear power plant project management mode,Qinshan nuclear power phase II project management mode,Ling'ao nuclear power project management mode,the third phase of Qinshan nuclear power project management modes are compared,such as,in turn,sums up their advantages and disadvantages;After further research project management technology in nuclear power project integrated management,organization management,schedule management,risk management,contract management,the application of P6 especially role in project schedule management.In EPC general contracting mode Fang Jiashan nuclear power project management practice as a case,makes a deep analysis and discussion,Detailed the application of EPC mode of project management technology,and focus on the application process and results.of the P6 software in Fang Jiashan construction management,Through a lot of research and practice that have industry particularity of nuclear power project management using EPC general contracting mode is more advantageous to the benign development of the industry,innovation and the necessary project management technology can ensure more nuclear power project management efficiency.
Keywords/Search Tags:EPC, General contracting mode, Nuclear power projects, Project management, P6 software
PDF Full Text Request
Related items