Font Size: a A A

Study On The Risk Control Of The Provincial Demonstration School In Qiqihar Forestry School

Posted on:2018-03-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y C HeFull Text:PDF
GTID:2322330542453570Subject:Engineering
Abstract/Summary:PDF Full Text Request
Forestry technical education is a link to maintain the normal operation of the economic and social life,promotes the social development and employment,economy,not only affects the speed of economic development and the improvement of comprehensive national strength,but also affects the social stability and the construction of socialist spiritual civilization.Vigorously develop the forestry technology education,has become the consensus of the Heilongjiang government and the majority of vocational education workers.Forestry Education in Qiqihar has achieved rapid development in recent years,with the focus on improving the employment rate of forestry education.It efforts to promote the implementation of forestry education and economic development are closely docking "unique characteristics of Heilongjiang vocational education development strategy of forestry education in Heilongjiang will usher in a new spring.In order to promote the development of secondary vocational education,Heilongjiang supports 100 schools to carry out the reform of secondary vocational education.However,the project construction period is long.all kinds of uncertain factors make the project face many risks.It is based on the theory of project risk management at home and abroad,this paper takes the Qiqihar forestry school as the research object,and studies the risk of the project in the construction of demonstration school.The first chapter introduces the research background and significance,introduces the research methods and contents,the development status of the project risk management on the basis of reference in literature at home and abroad are reviewed,expounds the theoretical basis of project risk management,and provide a theoretical basis for further research;the second chapter briefly introduces the situation of Qiqihar forestry school and the basic situation project in-depth analysis of external factors of the risk of the formation of demonstration school project and internal factors,the risk of demonstration school consolidation project,project risk identification,to determine the list;at the same time according to the risk evaluation of risk probability and impact of the project,determine the risk level of each risk factor.The third chapter of the Qiqihar forestry school at the provincial level demonstration school project construction process and risk control scheme,introduces each part of the project construction schedule and schedule control and tracking process,risk control project research demonstration school project,for each risk to develop a risk control plan,reduce risk and avoid risks,reduce losses caused by the risk of the project.The fourth chapter demonstration school project risk control measures,put forward specific measures from policy and mechanism,organization,management system,financial management,improve the level of project risk management demonstration school.Finally,the paper summarizes the work done in this paper,and prospects the future research.In the process of implementing the project,the investment of the demonstration project is large,and the risk management has been accompanied by the whole project.In order to achieve the project objectives within 2 years,we must strengthen the management and control of risk factors,avoid risks and reduce the impact of risk on the project.In this paper,the demonstration school project risk control program can provide a useful reference for the construction of the second batch,the third batch of demonstration school projects.
Keywords/Search Tags:Model school, Risk management, Risk control
PDF Full Text Request
Related items