Font Size: a A A

Research On Power Facility Layout Planninig Of Distribution Network In Hangzhou Zhijiang Resort

Posted on:2018-09-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y XueFull Text:PDF
GTID:2322330518960724Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of economy,the planning of power network must be adapted to growth of cities and adjustment of regional function.In order to meet the demand needs of electricity in Hangzhou Zhijiang National Tourist and Holiday Resort,the structure and capacity of electric must be optimized and improved in further.In that way,the plan in recently is must be combined in future,construction is aggress with the transformation in cities,as well as the grid connection and facilities standardizations.In this paper,the actual situation of network has been carried out,combined with the needs of national economic development in Hangzhou Zhijiang National Tourist and Holiday Resort.Meanwhile,the frame layout planning has been also building with electric facilities.In this research,three aspectshave been finished.In the beginning,the actualperformance of Hangzhou Zhijiang National Tourist and Holiday Resort has been researched,including the substation capacity of 110 KV,the line of 10 KV and theswitching station of 10 KV.The second part,the saturated capacity is forecastedwith each area.And in order to ensure the accuracy of load forecasting,the electricload has been measured and checked.In the last,distribution networkframe has been builded,including the substation,lines,the distribution transformer,and switch.Based on the research results,the opinion of construction on the urban high voltage distribution network in Hang Zhou has been given.Development of urban high voltage the distribution networkis also promoted.
Keywords/Search Tags:distribution network, planning, load prediction
PDF Full Text Request
Related items