Font Size: a A A

Game Analysis Of Related Party In Construction Process Based On Project Management Optimization

Posted on:2017-05-20Degree:MasterType:Thesis
Country:ChinaCandidate:J Y ChenFull Text:PDF
GTID:2322330515965828Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,our country's civil engineering construction is developing rapidly,and the country's investment and planning of infrastructure industry has maintained a steady growth trend.However,the level of engineering project management in China has long remained in the lack of scientific theory to support the level of administrative management.Construction project department information management level is low,the project management all aspects need to optimize.The phenomenon of information asymmetry between each project related parties is more serious,so that the lack of effective information in the process of the game.At the same time,the project stakeholders as a participant in the choice of the game strategy is still relatively blind,the project related parties appear conspiracy and rent-seeking behavior and other issues have yet to be resolved.At first,the article analyses construction general contractor of the project management status and problems and carries on the analysis and consideration,to optimize the existing work of construction project management by means of information management,and then to reduce the information asymmetry of information barriers as the main target according to project management,analysis and research.On the basis of,for the project to participate in game process to establish a preliminary complete information environment,to in the construction side of the angle respectively from the internal and external game analysis,found in the foreign game process should pay attention to by laws and regulations,government departments and other external force effect to improve the outcome of the game,of internal construction should pay attention to create a relaxed working atmosphere sub units in the degree of optimism is controlled in a reasonable range in the,and thus more conducive to the results of the internal game.Combining case between project stakeholders tripartite game analysis,hand drawn with respect to intensify supervision and punishment,the owner should put more energy input in prevention of general contractor and subcontractor units collusion is more appropriate,on the other hand,owners of units and efforts to improve the effective supervision and inspection process is the probability of is the most practical and important ways to reduce the rent-seeking behavior of construction.
Keywords/Search Tags:Project Management, Related Party, Information Asymmetry, Game
PDF Full Text Request
Related items