Font Size: a A A

Application Of The Quality Management Methods In The LE Construction Process

Posted on:2018-05-03Degree:MasterType:Thesis
Country:ChinaCandidate:G ZhangFull Text:PDF
GTID:2322330515471259Subject:Project management
Abstract/Summary:PDF Full Text Request
As our country's pillar industry and strategic industry,the development of the building industry directly affects the national economy of our country.From the perspective of building practice,the construction enterprises in our country still mainly use the traditional management methods to carry out the project management,in which much attention has been paid to the owner or the manager of "person governance".Some construction enterprises are in low efficiency,and the investment incomes are not high.The excellent rates of engineering quality stagnate at a lower level.What's more,there also appear some unqualified works and "tofu" buildings in some construction projects.Thus it puts forward higher requirements to building construction enterprises,urging them to study scientific quality management theories and methods and put them into use,to improve the quality of construction management level and then produce much more high-quality construction products.This paper studies the application methods of the building project quality management(CQM)in the construction process,analyzing the methods of carrying out the construction quality management from three aspects---the organization management,the technical management and the analysis management.And it puts forward the constructive suggestions about management methods and applications,in order to make the construction enterprises to improve the quality management efficiency,realize the sustainable and healthy development.Research methods of this thesis takes the methods of theories combined with case analysis.Firstly,the paper discusses the related theoretical knowledge about the quality management method(CQMM)in the construction process,and puts forward the general processes and management methods of the construction quality management.Combined with the example of LE building,this paper uses Arrangement chart analysis to study the situation of the construction quality management and the existing problems,confirming the main causes of the LE project---poor management of construction technology and poor process quality control.By the method of Fish-bone diagram,it further studies problems in the construction quality management of the LE building project,and the specific reasons include:"misunderstandings of the construction technical specification","unknown main parts of process quality controlling","more casual of construction technology application","lacks of quality and acceptance procedures","lacks of supervision of construction technology" and "the participants in the process quality inspection are not clear" and so on.And causes of the different construction quality management problems are from different stages.In the end,based on it,according to the construction quality management process,the paper puts forward the solutions to the problems of LE project construction quality management:promoting the organization construction,revising the quality management plan,and adding and improving the quality management system;Strict implementation of the construction quality management plan,promoting the reasonable application of the construction technology;Vigorously strengthening to check the implementation work of the construction quality management plan.
Keywords/Search Tags:Building project, Methods of the quality management, Arrangement diagram analysis methods, Fish-bone diagram
PDF Full Text Request
Related items