Research On Risk Management Of Project Schednle On National Office Of Chinese Medicinal Herbs Inspection Center

Posted on:2018-12-04Degree:MasterType:Thesis
Country:ChinaCandidate:X WangFull Text:PDF
GTID:2322330512989026Subject:Engineering
Abstract/Summary:PDF Full Text Request
Project risk management is the important field of project management theory and practical issues,China’s construction projects generally low profit margins,the risk means not only projects likely to fall into a loss situation,could mean the failure of the project management.In the field of project risk,schedule risk is easy construction side were ignored by the field,compared to produce and quality risk,technology risk and other risk factors are direct consequences of risk,schedule delays frequently occur,but they often neglected,but in practice,duration increased often leads to more equipment rental fees,staff wages and duration of default penalties and other consequences.At the same time,some construction may also be due to rush deadlines and ignore the quality and safety risk,triggering a chain reaction type.Therefore,scientific and effective management of the project construction schedule is an important foundation for the benefit and efficiency of the project.This paper in traditional Chinese medicine inspection center project the construction project as the research object,risk factors of the construction schedule management of identification,evaluation and control,by proposing suggestions for similar projects and provide reference for the.Firstly the research background,significance,research methods,technical route are described,and has carried on the induction and the summary about the domestic and international related research.On the basis of,this paper on national medicine inspection center project and construction schedule management status is analyzed,including introduction to the project,project organization structure,the construction conditions and features of the traditional Chinese medicine inspection center project,project schedule management principle and schedule arrangement.At the same time,the project schedule management in the existing risk were identification and evaluation,mainly through the expert scoring method for potential risk factors for identification and evaluation,and summarizes the risk problems,including lack of scientific progress control,schedule management plan and measures are too general,emphasizing the schedule is easy to cause the construction quality and safety risk.For countries in the test of Medicine Center project construction schedule management in the presence of risk,this paper presents for improvement measures,including clear progress control of the overall framework,based on the critical path method of project schedule control plan formulation,including determine the project operation,sort of the project task,project activity time estimation,development of the construction project schedule,schedule the refinement of project management.At the same time,this paper also for the improvement measures and the protection scheme is put forward,including strengthening quality control of the construction of the project,establish quality system assurance measures,improve the technology and process,enhance project quality level including improving security program and organizational guarantee.
Keywords/Search Tags:Construction project, Schedule management, Schedule Risk
PDF Full Text Request
Related items