The Research On Schedule Management Of The Training Base Construction For Harbin West Station

Posted on:2017-07-08Degree:MasterType:Thesis
Country:ChinaCandidate:W TangFull Text:PDF
GTID:2322330512957923Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years, with more and more high-speed rail station into operation, to strengthen the training of the main positions of high-speed rail workers, improve the quality of personnel training to become a high speed rail, an important part of safety. The staff training method from the traditional theory teaching reform mainly to the implementation of outstanding ability, so the training base construction projects increased, while the complexity of the construction design and construction difficulty also showed a rising trend, increasing the difficulty of project management, project team operation capacity management level, directly affect the progress of the construction of training base the project, as well as the final deliverable quality level. In order to cope with the increasingly complex requirements of project construction, how to through the high level of project management activities to achieve established in the project quality, delivery and other limiting factors, quality, delivery and construction tasks, be placed in front of all relevant management staff of the urgent problem, but also the core content of management of all training base project construction of the building.This paper takes the Harbin West Railway Station high speed rail station training base construction project as the research sample, analyze the key problems of construction project management in the process of progress from the aspect of management, and through the analysis of examples of project management concepts and methods for the significance and function of the engineering construction project management. High speed rail station training base construction project involves all aspects of project management activities, more comprehensive internal and external factors of interference received, process control is very complicated; the construction progress of the project management is an important part of the specific content, including project definition, sequencing, duration estimating, link planning and control etc.. By using the WBS work breakdown structure, the high speed rail station training base construction project is divided into a plurality of work packages, and then through the method of drawing out node network construction plans, based on the calculation of each work package plan period, and the earliest start time and latest finish time, the period of time; using the simulation method to estimate the entire project period length of the expected value, and through the calculation of each project length of time lag, finally calculate the length of time the total project, and get the critical path of the construction project; to prepare a schedule with network planning technique. Training base in the construction process using a comparative method to track, to complete the task on time.Based on the practical research of the Harbin West Railway Station high speed rail station training base construction project schedule management, find out the significant problems about the progress of the project management in the application of the link; on the basis of modern project management theories and methods of system tools, through practical research of the Harbin West Railway Station high speed rail station training base construction project schedule management, find out the significant problems about the progress of the project management in the application of the link; on the basis of modern project management theory and method, presented a solution of risk assessment, including pre project, project plan and put forward suggestions, and have practical guiding significance to the development of the project; at the same time, this set of theories and methods the same pattern and pactice for other domestic high-speed railway training base construction project provides some successful experience of reference value is conducive to the rapid development of the railway system in the domestic high-speed rail professional skills training.
Keywords/Search Tags:Schedule management, training base, work breakdown structure, network plan
PDF Full Text Request
Related items