On The Hydrographical Survey Schematic Of Southern Channel Of Tianjin Port

Posted on:2015-04-15Degree:MasterType:Thesis
Country:ChinaCandidate:Z G WangFull Text:PDF
GTID:2322330488462490Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
Hydrographical survey is a key segment of channel digging,it is very important for the proper organization of channel digging,quality monitoring and controlling,controlling of process,and so on.Precise channel survey is of significance,it can provide reliable technical insurance,and it can also give valuable data to the calculation of engineering quantity as well as construction of navigational aids,dredging of channel,and publication of hydrographic chart.Now,marine survey is easier,more flexible,and more precise with the using of GPS.This paper makes a deep study on hydrographical survey scheme of southern port of Tianjin.The content of study includes the current situation of channel survey,national and international requirements on channel survey,comparing of three typical sounding instruments.An analysis on the location,hydrographic condition,meteorological condition and navigation condition is made.Then it presents that Oct of every year is the most suitable period for the survey of this port.A method for channel survey is provided according to the direction of this channel as well as construction program.At the same time,the importance of preparation for channel survey is pointed out.The major content of this paper is shown as following:(1)This paper presents that the most suitable instrument for the survey of southern port of Tianjin is the multi-beam echo sounder,SeaBeam1180,and that Oct of every year is the most suitable period for the survey of this port.(2)According to the direction of channel,the arrangement of sounding wires is given.According to the characteristic of SeaBeam1180,the interval and overlapping breadth of sounding wires is determined.(3)In order to lower the error in the survey,the preparation is analyzed as well as the requirements of the preparations.(4)Construction program and final-period management including the monitoring of draft,sea state and data collection as well as analysis and handling of data is designed.
Keywords/Search Tags:hydrographic survey, the multi-beam echo sounder, sounding wire, data acquisition
PDF Full Text Request
Related items