Font Size: a A A

Study On The Comparative Advantage Of Developing General Contract Of Design And Construction Of Municipal Engineering

Posted on:2016-05-01Degree:MasterType:Thesis
Country:ChinaCandidate:P Q BaoFull Text:PDF
GTID:2322330485959591Subject:Project management
Abstract/Summary:PDF Full Text Request
With the urban public utilities reform process accelerated, the business model reform has caused wide concern. As the general contracting mode developed, municipal general contracting mode for the project has begun to promote exploration. Municipal project is different from the general construction project, it has higher complexity and more requirement of project owner. Compared with the traditional mode of the subcontract, general contracting mode in municipal projects is more comparative advantage. however, it still has the subjective and objective risk in the operation, How to understand the advantages and disadvantages of municipal projects to take general contracting mode has become the issue.In this dissertation, we study on the method of literature review, case analysis and normative analysis, explore the comparative advantage in a municipal project general contracting mode, looking for some method to enhance its comparative advantage and the relative path to promote the development of municipal project. Research includes the following contents:First, introduce the research background, purpose and significance, ideas and methods, related literature, especially introduce the general contracting mode, and the comparison of general contratcting mode between home and abroad; Second, analyze the dvantage of municipal project adopts the general contracting mode, specifically analyze Tianjin's municipal project general contracting mode condition; Third, combining with the Tianjin municipal bridge construction project as a case, analysis the special provisions of the proposed project owner, and analysis the advantages of general contracting mode compared to traditional mode; Fourth, According to the full text of the analysis, put forward the municipal projects to take general contracting mode improve Suggestions, including: Perfect the early stage of the bidding work, get the best procurement scheme; Strict implementation of municipal project budget; Strict cost control of construction stage; Strict settlement control; Perfect the relevant laws and regulations; Formulate relevant contracts, strengthen the standardized operation; Strengthen personnel training, and promote the municipal industry and design the transformation to the direction of the engineering company.
Keywords/Search Tags:municipal projects, General contracting, Comparative advantage
PDF Full Text Request
Related items