Font Size: a A A

Research On Cross Construction Management Of Shenyang Metro Construction Project

Posted on:2016-11-17Degree:MasterType:Thesis
Country:ChinaCandidate:J L SangFull Text:PDF
GTID:2322330482967671Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of urbanization in our country, a large number of people are pouring into the city, in order to ease or solve the traffic problems in urban development, population density city or central city in the development of urban subway construction. And because around the new city subway the lack of management experience, in project management, a variety of management issues, in the project management field, different participation units, professional cross construction problem is particularly evident.The city subway construction has the construction investment, construction professional, cross construction complex, high security requirements. This article from the Shenyang subway construction project in the actual management of the problem, considering the subway safety accidents and the current national laws and regulations, to solve the actual management problems, the purpose is to form a subway construction management personnel can implement the project process management manual, so as to prevent problems in the management, to avoid the occurrence of safety problems, safety hazards, engineering rework, and then save investment.Specific measures for the first analysis of all professional construction drawings, according to the construction drawings in the cross section of the professional construction of the cross section of the number, through the statistical, mathematical calculation method, based on the analysis results, combined with the actual project management to the overall arrangement and layout, reduce the construction project management workload, complete the first step. After through the detailed analysis of cross construction content and the risk points, a detailed list of cross construction management details, containing the professional construction process need follow up management, with other professional, easy to project management to corresponding stage, pre integrated, have a definite object in view. Finally, the construction project management project management, through the whole project management process, to facilitate the project management of the overall management of the party.Paper through analysis, has formed a reasonable allocation of construction projects for project management package principle, clearly put forward the the participation of the professional division interface, and finally formed for engineering construction site management of the project file table, fully improve Party A in engineering management science to grasp the specific situation, the overall situation, in order to resolve project risk management, avoid because of construction coordination, with the problems of safety hidden danger, avoid rework.
Keywords/Search Tags:Subway construction, project management, cross construction
PDF Full Text Request
Related items