Domestic Construction Engineering Project Settlement Way

Posted on:2017-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:G H WuFull Text:PDF
GTID:2322330482491152Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with our country economy, culture and increasing efforts in opening to the outside world, the Chinese characteristic socialist market economy rapid convergence with the developed countries in the world. Our country construction by project settlement way there have been 13 years. In practice, many problems listing the method of payment. The completion of settlement of these problems directly affect the construction enterprises, capital backflow. It is not conducive to building products complete, more conducive to the benign development of the construction market.This article through to norm the method of payment, country listing the method of payment, project consultation management company listing settlement way of research, analysis of project settlement case, find out the difficulties of domestic construction project settlement, controversial points and existing problems. Based on the experience of the foreign engineering project settlement, clearing guarantee measures are put forward.Finally, it is concluded that more in line with our country market economy condition, optimization of construction project settlement way, namely the labor whole take the rate of price discount in advance to the direct labor, and labor market price comparison, judge whether the settlement of labor is reasonable, and adjust, weaken the fare, return to the market price. Through research into a force for the development of domestic construction industry.
Keywords/Search Tags:Fixed settlement, Listing and settlement, Safeguard measures, To optimize the method of payment
PDF Full Text Request
Related items