The Study Of Hydraulic Hybrid Special Vehicle Project R&D Stage Risk Assessment For A Company

Posted on:2015-12-24Degree:MasterType:Thesis
Country:ChinaCandidate:G QinFull Text:PDF
GTID:2309330503450371Subject:Project management
Abstract/Summary:PDF Full Text Request
A company’s hydraulic hybrid main content sanitation truck project development phase of the risk assessment study is risk event(or factors) hydraulic hybrid sanitation truck project development cycle project risk identification, risk assessment project, project evaluation and project risk response the study. Risk identification section when using the Delphi method to identify relevant risk factors, first of all the information collection, integration, in accordance with certain principles of internal and external stakeholders to collect complete information system, and then the program will have a certain potential risk products, processes, events, phenomena and personnel classification. In the risk assessment section were analyzed using the risk matrix method, followed by the estimated risk of the possibility of a potential problem, according to low, medium, high classification, followed by re-estimate the impact on the entire project after these potential problems, so that can be drawn from the risk matrix, when the risk assessment to evaluate the fuzzy comprehensive evaluation method, the risk Assessment section of the fuzzy comprehensive evaluation method to evaluate the overall risk of the project. Fuzzy comprehensive evaluation index system is the basis for a comprehensive evaluation, and then build the evaluation matrix, establish the appropriate membership functions in order to build a good evaluation matrix determined by calculating the general risk factors, and the use of different risk levels of risk factors for different coping strategies this is completed through the above steps in the risk assessment sanitation truck hydraulic hybrid project, through this study analysis, company A hydraulic hybrid sanitation truck development projects implemented in the risk of refinement, decomposition, carried out by the method theory optimization, or the transfer of risk aversion, the smooth progress of the project to provide a theoretical basis, in addition to this topic is the study of the practical application of a new technology, it will for a similar car class new product development projects also play a role in learning.
Keywords/Search Tags:Hydraulic Hybrid Special Vehicle, Risk Identification, Risk Assessment
PDF Full Text Request
Related items