Research On Risk Early Warning Of International Engineering Projects Based On FAHP

Posted on:2017-03-16Degree:MasterType:Thesis
Country:ChinaCandidate:L LiFull Text:PDF
GTID:2309330485474137Subject:Project management
Abstract/Summary:PDF Full Text Request
With the trend of internationalization, the world economy correlation enhanced gradually. Many companies take the strategy of going out. As a pillar industry of our country, construction industry also plays a more and more important role in the international stage. In recent years, the overall competitiveness of China’s foreign contracting enterprise is continuously strengthening. Engineering model also continuously explore, innovation. Better adapt to the international market. And strengthening of the United States, Europe and Australia and other developed countries investment. Has obtained the good momentum of development.But after seeing the lucrative market for contracting construction projects, because of the international contracting project with long construction period, contracts can be big, big money payment cycle and limit, management environment and bigger difference of contract subject characteristics multinational. Leading to international engineering inevitably has the characteristics of "risk". Country’s political and economic conditions, natural environment, the differences between the host country law, communicate, and the uncertainty factors such as monetary payments, all greatly increase the project risk. These risks to the operation and management of the foreign contracting enterprise brings great pressure. Even the enterprise. Based on this, this article from the perspective of "contractor", analyze the international project risk early warning system and research. Hope that through this article research to find a suitable for foreign economic contract enterprise risk management and risk control system, so as to enhance the level of enterprise risk management and control, and improve the level of overseas project operation and management efficiency. In the first place in risk management on the basis of relevant theoretical research. Combining with the characteristics of international engineering project. International engineering project from the Angle of qualitative identification of risk factors. Scientifically design a set of evaluation index system of project risk.Index system including three level indicators,11 secondary risk index and risk 34 three-level risk indicators; Then from the perspective of quantitative, this paper uses (FAHP) to build the international engineering project risk early warning model. Finally use XX group co., LTD. International large-scale projects for empirical research. Verify the validity of the model. Risk early warning model by adopting the combination of qualitative and quantitative method to evaluate the project’s overall risk "level". And you can find out the project key risk factors. In order to formulate the corresponding risk control measures.In this article to build international engineering project risk early warning model of the main is to make the project a nip in the bud. Before the risk occurs in a timely manner to take effective measures and curb the occurrence of risk. Through the monitoring project, the indicators of internal. Can system comprehensive evaluation of the project risks. This, in turn, can make risk prevention measures. Avoid cause a great loss to the international contractors. For foreign contractors provides a feasible risk management tools.
Keywords/Search Tags:Risk early warning, International contracting project, FAHP, Risk management
PDF Full Text Request
Related items