Tianjin Land Twelve City 6 City Real Estate Project Cost Management Research

Posted on:2016-02-24Degree:MasterType:Thesis
Country:ChinaCandidate:B LiuFull Text:PDF
GTID:2309330482464811Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction industry in our country has become the pillar industry of the national economy. It not only relates to the economic development of the whole country, but also affects the improvement of people’s living quality. With the rapid development of China’s economy, the state gradually increase investment in construction projects, and domestic construction enterprises in the project cost control is not good enough, management means is still in an extensive, empirical level, there is a cost management positioning is unclear, responsibilities, management procedures and links, management method is not scientific and many other issues, which seriously affect the competitiveness of enterprises and development space. Therefore, it is an urgent problem for most domestic construction enterprises to implement the scientific cost planning, control and analysis methods, and to promote and protect the cost of enterprises. Optimization and control of the paper to Tianjin earth twelve city the 6th project as the research object, try the idea of cost optimization and management will be applied to the project cost management, to explore a scientific and reasonable construction project cost management system.Through Tianjin land of twelve of the city:the project cost control the whole process of research, the project cost control is divided into a plurality of implementation link, each link in the cost control problems might arise. These questions to carry on the summary analysis, combined with the theory of the knowledge of, finally put forward the way to solve the problem. First discusses the cost control study of the theoretical basis, then according to Tianjin earth twelve city the 6th project profiles, time limit for a project plan is described in detail, and to project cost control and improvement work as a means, to reduce costs as the goal, through the use of earned value method to strengthen the control of the scholarly Garden District cost. As taking safeguard measures proposed Tianjin city land cost control system of the twelve city six project.
Keywords/Search Tags:project cost, cost control, schedule, earned value method
PDF Full Text Request
Related items