Assessment And Control Research Of Investment Risk Of Fengnan Port Construction Project

Posted on:2016-08-03Degree:MasterType:Thesis
Country:ChinaCandidate:X ZhengFull Text:PDF
GTID:2309330479450459Subject:Project management
Abstract/Summary:PDF Full Text Request
Enter since twenty-first Century, the global economic model to the Multi-National Corporation as the main body of steady growth, the rapid development China port construction project is mainly due to China’s port construction lag caused by, want to develop the port construction projects must have huge funds as the backing, now for the risk of the port project investment and financing situation of increasingly prominent.First of all, after this article described on port investment project style and character, the port investment risk, methods and standards that the final risk assessment.Secondly, through the analysis of port construction project investment situation and existing defects, focuses on six big risks, Fengnan port construction project investment presents respectively is: operational risk, market risk, policy and environmental risk, financing risk, technical risk and the risk management level, and described in detail fully reflect the various risk.Once again, the reason of investment risk comprehensive port project, to create the perfect target establishment criteria, risk in port investment project evaluation target establishment, meanwhile combining Fengnan Port case to clarify the investment risk evaluation of port projects. Finally on the basis of the progress of construction projects were made stage risk prevention way.
Keywords/Search Tags:Investment of construction project, Investment risk, Risk assessment, risk control
PDF Full Text Request
Related items