Study On Project Risk Management Of Hydropower Station

Posted on:2016-08-10Degree:MasterType:Thesis
Country:ChinaCandidate:F YingFull Text:PDF
GTID:2309330473955143Subject:Project management
Abstract/Summary:PDF Full Text Request
China’s current water conservancy and hydropower construction projects into the overall development period, many famous large-scale projects have been started, put into operation; numerous small and medium hydropower projects are mushrooming development, which brings us to the management requirements : How to successful completion of each project to provide effective safeguards? How to achieve the minimum cost(resources) to achieve the maximum benefit of the investment purpose? How to deal with issues in a smooth implementation of the project construction constraints appear in the whole process? How to effectively predict and control the construction process may occur on various risk events stand out, which is why we are currently in urgent need of a study on the topic.The author has long been engaged in their own hydropower construction project management process personally met all kinds of examples of hydropower construction risk analysis as the starting point of the problem, through specific Project, exposing hydropower construction project management process various types of risks, and for of proposed countermeasures, provide research and reference value for the risk management industry, and promote the healthy development of water conservancy and hydropower project construction. The main content.1, Risk management steps: risk identification, risk estimate, risk evaluation, risk response to monitor, information feedback of result of risk management of several major steps.2, the basic concepts of risk management understanding and definition. General approach to risk management are risk of loss control, risk avoidance, risk transfer, risk diversification, risk retention, risk monitoring and risk management methods applicable to various risk categories.3, through the introduction of the cases the project, the project risk identification leads to job content and process, risk source analysis, risk inventory build and dynamic management of the risk list.4, through the different risk categories of risk events, risk factor resulting risk assessment, risk measures should be taken in order to put forward, that is what the use of risk management methods.5, Finally, management measures and response method of universal significance and representative Hydropower Project in accordance with China’s current status of risk management.
Keywords/Search Tags:hydropower engineering, project management, risk analysis, inventory risk, risk management
PDF Full Text Request
Related items