Font Size: a A A

Risk Management Research Of Yantai Jiangtuan Zhuocun Agro-ecological Park

Posted on:2016-04-24Degree:MasterType:Thesis
Country:ChinaCandidate:R B TangFull Text:PDF
GTID:2309330473954174Subject:Project management
Abstract/Summary:PDF Full Text Request
Since the 1990s, agro-ecological park as a new model of agricultural development began appearing in recent years, it has developed rapidly, showing a trend of rapid growth characteristics. This means that our development model of agriculture is no longer confined to the traditional model, but began to develop agricultural science and technology, agriculture tourism, agriculture experience, agriculture leisure, sightseeing agriculture, agriculture pension and other direction. It also spawned a new type of tourism-agro-ecological tourism, it uses the eco-park development model, set of agricultural production, recreation, nature tourism, environmental protection, science and technology experiments, pension experience as a whole, thus unification on economic, social and ecological benefits. In recent years, driven by the impact of policy support, attracting a large number of investors to invest in agro-ecological park. But as the agro-ecological park construction projects, it has a common feature of large-scale projects, long construction period, high investment, the returns of long, during the construction project inside and outside often disturbed many unfavorable factors, it means a huge risk. Therefore, it’s important for the agro-ecological park project to have a systematic and comprehensive research on risk recognition, risk estimation, risk assessment, and risk response. During the development and construction of these projects must be risk management process throughout.In this paper, on the basis of literature review, and connecting with the actual survey, the first research paper analyzes the current situation of project risk management at home and abroad, the concept of risk and risk management, characteristics, classification and so on has made the important discussion; Phase of the project risk management, function and method are expounded respectively, mainly introduced the phase of the project risk management, including risk identification, risk estimate and evaluation, risk response. For this article is using the Fuzzy AHP Comprehensive Evaluation Method is used for emphasis on, step Ahp and fuzzy comprehensive evaluation method is made a detailed introduction. Then in Yantai Jiangtuan Zhuocun agriculture ecology garden project for study, on the background of this project, planning and design, investment estimation and financing, and the particularity of market orientation, etc, the integrated use of the theory and methods of engineering project risk management, puts forward a set of methods suitable for the project risk management, and worked out a more detailed project risk management plan. Finally, the scheme used in Yantai Jiangtuan Zhuocun agriculture ecology garden project, for effective risk management, using expert investigation method for project risk identification, risk and the recognition results are preliminary, and the risk analysis using the analytic hierarchy process Ahp to identify, analyze the main risk, then the results according to the Ahp, combined with the fuzzy comprehensive evaluation method to evaluate the overall risk of the project. Then according to the actual situation of Yantai Jiangtuan Zhuocun agriculture ecology garden project, obtained the key of reasonable and effective risk response. From Yantai Jiangtuan Zhuocun agriculture ecology garden project can be concluded that the risk management methods and measures for agricultural ecology park project is a common operation and high practical significance..
Keywords/Search Tags:Ecological agriculture, Risk management, Risk assessment, Risk response
PDF Full Text Request
Related items