| In the promoting progress of science and technology, the enterprises is to adopt new technology, new technology and new advanced equipment for existing facilities, production environment and supporting facilities to technological transformation, in order to expand reproduction, increase of new varieties, reduce the waste of resources, reduce raw material consumption, improve labor productivity and bring a higher economic benefit. Practice has proved that the use of advanced adaptive technologies to transform traditional production line, which is beneficial to change the growth mode. Enterprises occupy a more advantageous position in the competition.Production line technological transformation project is a large investment and high risk systems engineering project, so there are a variety of risk factors and uncertainties in the project life-cycle, and the traditional management methods cannot meet the control of risk factors. The management of risk must be established a risk management system for its control measures in the use of science analytical tools. Risk management has become an important part of enterprise management in the process of transformation of production line project.Poly carboxylic acid with high-performance water-reducing agent is a new generation of high performance water reducing agent, the original technical process, excellent comprehensive performance, is the ideal additive production of concrete with different strength grades and precast concrete. It can be widely used in industrial and civil construction, municipal engineering, water conservancy and hydropower engineering, road and bridge, subway and other fields.In order to speed up the development of the city building and infrastructure development in the field, LJ achieves the goal of specialization, standardization and scale of polycarboxylate high-performance water-reducing production, put forward to control the production process automation. It is used to effectively control risks in the process of renovation project, avoid or reduce the impact of risks. Risk management of industrial transformation production line is post in an important position.This paper mainly researches the application of risk management method in the industrial transformation of production line. Combined with the specific case and the related theory of risk management in the industrial transformation project, it propose control scheme of project risk after the risk identification, risk assessment and risk response for the industrial transformation project of poly carboxylic acid production line. First of all, it establishes the scientific risk management system in the implementation process, project organization and responsibilities, through the Delphic risk identification methods. The point of the project risk contains three aspects or ten indicators, such as project organization, equipment system and the technical risk.Then, the use of risk evaluation system to determine the risk evaluation index, that is, confirming a high risk and class A belonging to the equipment of system risk, technology risk as class B, project organization risk belonging to class C, determine the classification of risk management means. At last, the establishment of the risk management team is used to make effective measures for the key risk factors.The risk avoidance, mitigation, transfer and retention are been used to deal with the special risk, emphasized the scientific planning to reduce the technical risk, overall coordinate good construction management, and reorganize organization to improve organization efficiency.The paper combined with the actual situation of the specific project risk management research has the following two aspects of meaning: on the one hand, a more systematic project risk management to ensure that the industrial transformation projects can be carried out smoothly, the quality of the production line production can meet the standard requirements and stable performance. On the other hand, through the experience of risk management of the reconstruction project, the establishment of risk management methods is to deal with this kind of project risk management, improve the level of industrial batch after the transformation project. |