Font Size: a A A

The Program Of Hercynian (250mw) Wind Power Project Initiated By Datang Company, Qingdao Branch

Posted on:2016-04-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q SunFull Text:PDF
GTID:2309330467497888Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of our country’s economy, the environmentpollution problem is increasingly intensified, especially in fog weather is increasinglyserious, this is a wake-up call to human survival, for human in terms of energyapplication improved the more difficult task, that is the new energy revolution today.And Qingdao region in the people impression should be in accordance with themountain alongside sea, the scenery is beautiful, is a famous tourist city, the naturalhigher request to the environment. Just is the Qingdao area wind resources are veryrich, with the development of Qingdao area quickly, increasing demand for cleanelectricity energy, and wind power generation technology is mature, and constantlyget the strong support of national policy, natural in Qingdao have a broaderdevelopment prospects.Datang Qingdao hercynian (250mw) wind field is located in huangdao district,Qingdao city, originally for shall wind field, but the national new energy developmentand approval of the policy limit, in the province for approval each no more than50mw wind farm capacity, development speed and quality are greatly reduced. In orderto solve such problems, I put forward new ideas of development, it is concentratedexamination and approval, concentrated development and operations managementfocus. The advantages of many ways: first, to avoid to the government in order tospeed up the development of a whole piece of wind resources among several development company to jointly develop, because each family trait of design ideasand different start-up must exist between the barriers, so that each developer can onlydevelop50mw, there can be at most developers, combined the development capacityof150mw, causing a large250mw underutilized resources. Second, avoid the threedevelopment company each of the50mw wind power projects are to build a110kvbooster stations and a separate110kv transmission line, reduce the one-timeinvestment cost as a whole. Third, the lower the overall operational managementcosts, to avoid the various projects during the operating period are staying about20people, plus models vary, spare parts and maintenance technology is uneven, lead toeach project itself is not economic.To sum up, for the sake of the overall planning and reasonable structure, lowconstruction cost, operation and maintenance and economic effect is beautiful and putforward design scheme of datang Qingdao company exclusive concentrateddevelopment. The biggest characteristic of this design and advantages is theconcentrated development, completely broke the wind power industry in shandongprovince each wind power capacity is not more than50mw of traditional designpattern, not only speed up the approval, and reducing the costs of previous declarationand examination and approval. Also due to the sole development, overallconsideration to, unified planning, concentrated and large-scale development at thesame time, achieve the optimization of the overall design, to avoid a large highquality wind resources are various wind power development enterprises, built in windfarm is multifarious, form different color, not only influence the overall aestheticeffect. More major is fully, the use of wind resources, originally developed threecompanies each50mw, total150mw, and can reach250mw after concentrateddevelopment, with the same kind of the most advanced domestic wind power equipment, and focus a booster station and sharing out of a220kv transmission line,and not only the overall effect is beautiful, but also greatly reduces the project cost,improve the power generation benefits.
Keywords/Search Tags:windpower, project, program, planning, measures
PDF Full Text Request
Related items