Font Size: a A A

Management Of The Contractor Building Construction Project Risk Institutions Abroad

Posted on:2015-01-04Degree:MasterType:Thesis
Country:ChinaCandidate:M X FuFull Text:PDF
GTID:2309330467481335Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, with the continuous enhancement of China’s comprehensive strength and international influence, China’s rising international status, the increasingly close economic and cultural exchanges with other countries, foreign affairs exchanges have become more frequent. At the same time, the agency construction scale and the workload is increasing. With the rapid development of China’s diplomatic career abroad, can directly reflect the comprehensive national strength of our country’s embassies and consulates construction also becomes more and more important. On the one hand, the embassy or consulate building construction project not only greater scale, but also for the project design and construction quality also put forward higher requirements, the difficulty of implementation is also increasing. On the other hand, there are the construction project is the country’s political, economic, cultural and legal aspects of the unique, regional differences and international multilateral uncertainty exist many characteristics, the Consulate General construction project construction phase comparison, has more risk factors, more complex. Faced with this situation, as a long-term foreign construction enterprises or construction, improve the management level of the project as soon as possible, strengthen project risk management consciousness, formed a set of system, the project management methods, is particularly important.Based on the analysis of the basic theory of project risk management, the author as a foreign institution construction general contracting parties experience of foreign institutions, the contractor or construction project of risk are analyzed, and the feasible measures of risk management. This article first analyses the research status of risk at home and abroad to determine the research ideas and research methods, for a series of problems in risk identification, assessment, response to the in-depth research and analysis; secondly, according to the characteristics of institutions abroad project, the project of the various risk factors in the application of theoretical knowledge to identify, evaluation, and give the response methods; finally, application of engineering case project for the general contractor risk management analysis, proposes the risk prevention measures and feasible strategies, for China to participate in missions abroad embassies and consulates inconstruction project contractor risk management work of reference and help.
Keywords/Search Tags:DIC, Embassies and Consulates in Construction project, Project Management, Risk Management
PDF Full Text Request
Related items