| Risk management is one of the most important part of project management, which could reduce the frequency and result of risk. The fifth cold rolling project investment several billions, construction period of about two years or longer, involves civil, mechanical, electrical and other related professional, is a comprehensive system engineering. There are many uncertainties in the construction project which may affect the process of the project. In modern project management, risk management become hot spot of research.The fifth cold rolled project based on the B company was set as the research object.according to the risk identification, risk assessment, risk control, risk management, identify the main project risk factors which may encounter. using expert scoring method, FMEA method to analyze project risk from market, finance, construction, engineering, quality, production safety and environmental protection etc. and discuss the risk measures.This paper introduces the background of the fifth cold rolled project briefly. And tell why to do risk research on the project. Then introduces the theory of project risk management, project risk identification, evaluation, from the theory angle control stages were studied. Based on the identification of the fifth cold rolling project, A reasonable analysis and evaluation, put forward practical risk control measures. Last, we draw the conclusion that the control of the fifth cold rolling project based on company B risks should be strengthened. |