With the rapid development of diverse manufacturing industries, as well as the market environment, how to respond quickly to customer needs, shorten the production cycle, improve the flexibility of their products to cater to the diverse needs of customers, to ensure normal production conditions to reduce the backlog of inventory, improve the efficiency of production logistics operations become outstanding manufacturing companies to chase the target.In order to help enterprise managers to identify and eliminate waste in production process, this paper based on the theory of lean production to the entire production process E Company C series for the study, to optimize the production model, the integrated use of value stream mapping analysis hidden in the process of waste. By optimizing production and logistics path layout, improve production processes, the use of Flexsim simulation production activities, and optimize production bottleneck processes to reduce production inventory, reduce waste production activities, shorten production cycle time, increase productivity, and ultimately achieve fast response in-time production methods in customer demand.This article provides a reference for the E Company’s other products and other manufacturing companies in the same industry in the implementation of lean production in the future, but also on lean thinking has some significance in the specific application of manufacturing enterprises. |