Research On Quality Control Of Heilongjiang Mobil Private Cloud Resource Pool Supporting Engineering Project Design

Posted on:2017-03-16Degree:MasterType:Thesis
Country:ChinaCandidate:J WangFull Text:PDF
GTID:2308330482488856Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
With cloud computing technology matures and the development, application of cloud computing technology in the operator network construction constantly improve, already gradually from a single system pilot deployment of cloud computing application platform, to the large-scale construction of cloud computing resources pool 。In order to realize the unified dispatching of the resource pool and total life cycle management and operation and maintenance of resources, utilization efficiency of resource management and the level of ascension, and earnestly, Group headquarters has been building private cloud unified resource pool, load application focus is slightly different. Headquarters of the resource pool has been carrying multiple applications, including business platform, industry, network management, information system, covering the headquarters of the network department, business support systems, financial department, market sales department and party-masses work department, enterprise customers branch, procurement sharing center, principal center, teleport, online service companies, Internet of things applications of departments and so on。Mobile branch in heilongjiang province in 2015, synchronous implementation of private cloud resource pool construction, engineering construction entrust China mobile group design institute co., LTD., heilongjiang branch of heilongjiang mobile private cloud resource pool construction project "preparation stage design。.China mobile group design institute co., LTD., heilongjiang branch company, has been based on the design industry for 35 years, was approved by the national communication industry design class a, class a qualification of construction industry design units. Unit service scope including heilongjiang, liaoning, jilin, tianjin, the six provinces of ningxia, hunan communications industry market, completed thousands of China mobile communication engineering design projects, covering wireless, power supply, transport, lines, core network, data communication, planning, civil engineering consulting design content. Hospital business business consisted of heilongjiang, liaoning, jilin group, tianjin division, ningxia group, hunan division, supervision department, architectural design, planning, and 10 functional departments, has passed ISO9001 international quality system certification. Enterprise high-speed development to the quality as the core, and constantly adjust business strategy to strengthen management, efforts to improve the quality of design。Heilongjiang mobile private cloud resource pool construction engineering is the heilongjiang mobile network based hardware resources one of the large construction projects, on the premise of cost savings, active introduction of virtualization in the IT system, such as parallel computing, distributed cloud storage technology; Key IT systems gradually to high versatility and low cost hardware and software architecture evolution, to prepare for subsequent migration to the centralized cloud computing system. Taking market demand as the guidance, according to the requirements of the market combined with construction, adhere to the principle of centralized, unified planning, centralized construction enterprise private cloud(deploy business platform and the IT support system) and the public service cloud two types of cloud computing platform, IT resources effectively integrate entire network. In a production system timely introduction of \ " Cloud computing \" research results, improve enterprise business and network development and challenges of rapid response ability. With the development of the project design, the quality problems existing in the design of a critical leak。For heilongjiang mobile private cloud resource pool construction engineering project quality control from the Plan(the Plan) and implementation(Do) and inspect(Check) and processing(Action). In project quality control, the four phase cycling, formation of PDCA cycle, the specific steps: survey- root cause analysis-making countermeasures- countermeasure implementation-- consolidating measures to improve the inspection effect, and using the pareto diagram, scatter diagram, cause and effect diagram commonly used methods, such as real ascension design project quality。...
Keywords/Search Tags:Project management, survey and design, quality control
PDF Full Text Request
Related items