| In recent years, with the increase to the traffic infrastructure investment, in orderto overcome the traffic control on regional economic development, the highwayconstruction developed faster than any times. Understanding and researching highwayconstruction engineering measurement and payment information is also graduallyincreased. Highway construction engineering measurement and payment controls thehighway engineering quantity, amount of payment, materials, and progress, it is thewhole construction and supervision of the key business process that plays a veryimportant role, directly affect the efficiency and progress of construction andsupervision work. This paper designs and implements highway construction projectmeasurement system based on B/S model, in order to the whole process of scientific,standardization and automation management of highway engineering construction,construction and completion. This paper first discusses the main business of highwayengineering measurement and payment, describes the measurement and payment,payment metering of progress payment audit, start the advance payment and costchanges to buckle, engineering measurement data review, review of the interimprogress payment and payment, material equipment advance payment and deductiondaywork, measurement and payment, project payment and supervision cost paymentprocess, gives the process design and process audit component design of measurementand payment, project accounting and compilation methods described. The paperdesigns the overall function of the system architecture.Then, the paper discusses the engineering measurement and payment systemdesign process, given the system design principle, the function of the system structureis described, the main interface design prototype system are given, the design ofdatabase system logic model.Finally, the paper discussed the system development environment, give the keyfunction of the interface system operation flow chart, contract informationmanagement, engineering quantity list management, account management, contractengineering change order management, measurement, measurement report businessprocessing, management of business data audit system implementation. Accesscontrol problems, recovery mechanism, transaction based database based on the coretechnology to realize OWC data export and import system which gives. Measurement and payment system of highway construction project successfulimplemented, it provide a good solution and intuitive operation platform for thehighway engineering measurement and payment business. In the platform support, theimplementation of dynamic management and effective control of project constructionand supervision, improve the level of management, so as to achieve the scientificmanagement, reduce project risk, saving the cost of investment. |